bdnews24.com
Home +
  • Bangladesh
  • Politics
  • Campus
  • Education
  • Media
  • Environment
  • Health
  • Fashion
  • People
  • Automobile
  • Aviation
  • World
  • Science
Sport +
  • Sport
  • Cricket
World +
  • Middle East
  • Europe
  • Neighbours
Business & Economy +
  • Business
  • Economy
Features +
  • Opinion
  • Technology
  • Lifestyle
  • Entertainment
  • Hello
  • Stripe
Others +
  • Photos
  • Tube
  • Mobile

June 27, 2025

  • Bangladesh
  • Sport
  • Technology
  • Opinion
  • Politics
bdnews24.com
বাংলা
  • Budget 2025-26
  • World
  • Opinion
  • Entertainment
  • Lifestyle
  • Economy
  • Business
  • Cricket
  • Hello
  • Stripe
  • Recent
bdnews24.com
Home
  • Bangladesh
  • Politics
  • Campus
  • Education
  • Media
  • Environment
  • Health
  • Fashion
  • People
  • Automobile
  • Aviation
  • World
  • Science
Sport
  • Sport
  • Cricket
World
  • Middle East
  • Europe
  • Neighbours
Business &
Economy
  • Business
  • Economy
Features
  • Opinion
  • Technology
  • Lifestyle
  • Entertainment
  • Hello
  • Stripe
Others
  • Photos
  • Tube
  • Mobile
  • Media

Renovation causes suffering in Naya Bazar

Sewage line and water pipe installation work has been underway at French Road in Old Dhaka’s Naya Bazar for a long time. As the middle of the road is dug up, traffic is not able to move through the area, which has also affected local businesses. Local pedestrians are also suffering.

All types of traffic are closed due to the installation of sewage and water pipes on French Road in Old Dhaka’s Naya Bazar. The businesses in this area have suffered losses due to the lack of traffic. Photo: Asif Mahmud Ove
All types of traffic are closed due to the installation of sewage and water pipes on French Road in Old Dhaka’s Naya Bazar. The businesses in this area have suffered losses due to the lack of traffic. Photo: Asif Mahmud Ove
French Road has been dug up for the installation of sewage and water pipes. People walk on steel sheets in some places to avoid accidents. Photo: Asif Mahmud Ove
French Road has been dug up for the installation of sewage and water pipes. People walk on steel sheets in some places to avoid accidents. Photo: Asif Mahmud Ove
French Road in Old Dhaka’s Naya Bazar has been dug up for the installation of sewage and water pipes. As the work is not yet complete in many places, accidents occur due to the open pits. Photo: Asif Mahmud Ove
French Road in Old Dhaka’s Naya Bazar has been dug up for the installation of sewage and water pipes. As the work is not yet complete in many places, accidents occur due to the open pits. Photo: Asif Mahmud Ove
The renovation work on Old Dhaka’s Naya Bazar Road has been ongoing for a long time to install new sewage and water pipes. Photo: Asif Mahmud Ove
The renovation work on Old Dhaka’s Naya Bazar Road has been ongoing for a long time to install new sewage and water pipes. Photo: Asif Mahmud Ove
Pedestrians struggle to walk as there is not enough space on either side of the road in Old Dhaka’s Naya Bazar due to the ongoing installation of sewage and water pipes. Photo: Asif Mahmud Ove
Pedestrians struggle to walk as there is not enough space on either side of the road in Old Dhaka’s Naya Bazar due to the ongoing installation of sewage and water pipes. Photo: Asif Mahmud Ove
The renovation work on Old Dhaka’s Naya Bazar Road has been ongoing for a long time to install new sewage and water pipes. Photo: Asif Mahmud Ove
The renovation work on Old Dhaka’s Naya Bazar Road has been ongoing for a long time to install new sewage and water pipes. Photo: Asif Mahmud Ove
People walk from one side of the road to the other using wooden planks as the road in Old Dhaka’s Naya Bazar has been dug up for the installation of sewage and water pipes. Photo: Asif Mahmud Ove
People walk from one side of the road to the other using wooden planks as the road in Old Dhaka’s Naya Bazar has been dug up for the installation of sewage and water pipes. Photo: Asif Mahmud Ove
Pedestrians struggle to walk as there is not enough space on either side of the road in Old Dhaka’s Naya Bazar due to the ongoing installation of sewage and water pipes. Photo: Asif Mahmud Ove
Pedestrians struggle to walk as there is not enough space on either side of the road in Old Dhaka’s Naya Bazar due to the ongoing installation of sewage and water pipes. Photo: Asif Mahmud Ove

bdnews24.com

Published : 17 Sep 2022, 04:11 PM

Updated : 17 Sep 2022, 04:11 PM

  • Old Dhaka

  • Sewage line

  • suffering

  • Naya Bazar

Read More
ADB, WB clear $1.54bn in loans for Bangladesh
ADB, WB clear $1.54bn in loans for Bangladesh
Zimbabwe call on seamer Matigimu for S Africa Tests
Zimbabwe call on seamer Matigimu for S Africa Tests
Thai PM under mounting pressure
Thai PM under mounting pressure
Parties split on presidential election method
Parties split on presidential election method
Read More
Opinion
Read More
Editor-in-Chief and Publisher: Toufique Imrose Khalidi
News
  • Home
  • Bangladesh
  • Business
  • Politics
  • Economy
  • World
  • Technology
  • Science
  • Environment
  • Health
Op/Ed
  • 1971
  • Achievement
  • CHT
  • Corruption
  • Culture
  • Democracy
Social
  • Facebook
  • Twitter
  • Instagram
  • Youtube
  • WhatsApp
Features
  • Tech
  • Lifestyle
  • Entertainment
Others
  • Stripe
  • Hello
  • Mobile
Sport
  • Sport
  • Cricket
Follow us
  • Disclaimer & Privacy Policy
  • About Us
  • Contact Us

Copyright © 2025, bdnews24